Task Time Estimator

PERT expected duration = (optimistic + 4 × most likely + pessimistic) / 6. Enter your own values; the result updates only when you run the tool.

No account neededClear inputs. Real results.Share tool link
1

Your inputs

Use consistent units. Examples appear below each field.

Example: 2
Example: 4
Example: 10

Inputs are used for this result. Saving is your choice.

2

Your result

Ready when you are.

Make the numbers useful.

Fill in the input panel and run the tool. Your answer and its calculation method will appear here.

Behind the result

How task time estimator works

PERT expected duration = (optimistic + 4 × most likely + pessimistic) / 6.

Try this example

Optimistic hours
2
Most likely hours
4
Pessimistic hours
10
4.6666667

Good to know

Which values should I enter?

Use the units shown in each label. PERT expected duration = (optimistic + 4 × most likely + pessimistic) / 6.

Are my inputs saved automatically?

No. Recent tools contain tool names only. Inputs and results are stored only when you explicitly choose Save while signed in.

Can I share this tool?

Share the tool link. It opens a blank tool and does not include your private inputs or result.